Scoraig Primary School windmill replacement

Sept 2003
Base
Assembly and erection

wednesday 3/9/3












Wednesday 10th

Monday 15th
Making a template was a little tricky because the baseplate was not flat underneath.


Drilling the holes with a wet diamond core bit.
The drill stand clamps onto the floor with a vacuum pump and has a spirit level to check for vertical.

Tuesday 16th. Making progress.  Using lots of water.



Wednesday 17th
Setting the bolts in place using the baseplate to position them precisely for spacing and level.

Assembly and erection