Monday 15th
Making a template was a little tricky because the baseplate was not
flat underneath.
Drilling the holes with a wet diamond core bit.
The drill stand clamps onto the floor with a vacuum pump and has a
spirit level to check for vertical.
Tuesday 16th. Making progress. Using lots of water.