Scoraig Primary School windmill replacement

Sept 2003


Assembly and erection

Friday 26th Septermber
back
I missed quite a it of the tower assembly work, due to being away on Eigg.

Winching the top tower section onto its taper with a 1.6 tonne trifor





sliprings



Fitting the first blade


The spring assemblies were fitted without being disassembled, which was fiddly.


Time to haul it upright.





back