Dates: 18 - 23 August 2008 newspaper article Project: 3 metre diameter wind turbine connected to grid via windy boy 1700 watt inverter. Based on my Recipe Book ![]() |
LOCATION KRUG
S.A.R.L. |
Organisation Tripalium ![]() |
with help from Scoraig Wind Electric Hugh Piggott ![]() |
Blades ![]() |
Electrics ![]() |
Steelwork ![]() |
Around ![]() |
Assembly ![]() |
Thomas Plassard
![]() |